Find valuable commercial leasing vehicle information in this section, providing you with new model guide and incentive links, as well as links to the major manufacturers.

Manufacturers’ Build-out and Start-up Dates

Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Audi

The following chart provides vehicle build-out and start-up dates for Audi. These updates change regularly and were last updated on January 16, 2019.

Buick

The following chart provides vehicle build-out and start-up dates for Buick. These updates change regularly and were last updated on March 29, 2019.

Cadillac

The following chart provides vehicle build-out and start-up dates for Cadillac. These updates change regularly and were last updated on April 8, 2019.

Model 2019 Fleet Final Order Due Dates 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
ATS Coupe 10/24/2018 01/24/2019 21-23 wks TBD TBD 21-23 wks
ATS Sedan 10/24/2018 01/24/2019 21-23 wks TBD TBD 21-23 wks
ATS V Series - Sedan & Coupe 10/24/2018 01/24/2019 14-16 wks TBD TBD 14-16 wks
CT6 11/30/2018 08/02/2019 10-12 wks 5/23/2019 8/5/2019 10-12 wks
CTS 01/24/2019 04/17/2019 8-10 wks TBD TBD 8-10 wks
XTS 05/02/2019 09/27/2019 11-13 wks TBD TBD 11-13 wks
SUVS & CROSSOVERS
Escalade 03/21/2019 06/22/2019 10-12 wks 5/9/2019 6/24/2019 10-12 wks
Escalade ESV 03/21/2019 06/22/2019 10-12 wks 5/9/2019 6/24/2019 10-12 wks
XT5 04/25/2019 07/26/2019 10-12 wks 6/6/2019 8/5/2019 10-12 wks
Model 2019 Fleet Final Order Due Dates 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Chevrolet

The following chart provides vehicle build-out and start-up dates for Chevrolet. These updates change regularly and were last updated on April 30, 2019.

Model 2019 Final Fleet Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Bolt 04/25/19 07/19/19 13-15 wks 06/06/19 07/22/19 13-15 wks
Camaro Coupe & Convertible* 04/25/19 07/18/19 8-10 wks 06/06/19 07/22/19 8-10 wks
Corvette Stingray Coupe & Convertible TBD TBD TBD TBD TBD TBD
Corvette Z06 Coupe & Convertible* TBD TBD TBD TBD TBD TBD
Cruze Hatchback 11/30/18 03/01/19 14-16 wks N/A N/A 14-16 wks
Cruze Sedan 11/30/18 03/01/19 14-16 wks N/A N/A 14-16 wks
Impala TBD TBD TBD TBD TBD TBD
Malibu 03/18/19 05/31/19 10-12 wks 04/25/19 06/03/19 10-12 wks
Sonic 04/25/19 07/19/19 13-15 wks 05/23/19 07/22/19 13-15 wks
Spark 02/21/19 05/31/19 27-29 wks 03/28/19 06/03/19 27-29 wks
Volt 11/30/18 02/15/19 13- 15 wks TBD TBD 13- 15 wks
TRUCKS
Colorado Extended Cab 4/25/2019 7/15/2019 9-11 wks 5/23/2019 7/15/2019 9-11 wks
Colorado Crew Cab 4/25/2019 7/15/2019 9-11 wks 5/23/2019 7/15/2019 9-11 wks
Silverado LD/1500 Reg Cab Next Gen 1/10/2019 8/3/2019 21-23 wks 5/9/2019 8/5/2019 21-23 wks
Silverado LD/1500 Double Cab Next Gen 4/24/2019 11/1/2019 12-14 wks TBD TBD 12-14 wks
Silverado LD/1500 Crew Cab Next Gen 4/24/2019 8/3/2019 12-14 wks 5/9/2019 8/5/2019 12-14 wks
Silverado Medium Duty 5/23/2019 8/30/2019 12-14 wks 5/9/2019 9/3/2019 12-14 wks
Silverado HD/2500/3500 Crew Cab Next Gen ** 4/27/2018 5/10/2019 TBD Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD
Silverado HD/2500/3500 Reg Cab Next Gen 11/22/2018 4/25/2019 14-16 wks 7/18/2019 9/1/2019 14-16 wks
Silverado HD/2500/3500 Double Cab 8/1/2019 12/13/2019 11-13 wks 7/18/2019 8/1/2019 11-13 wks
Silverado HD/2500/3500 Crew Cab SRW** 4/27/2018 5/10/2019 TBD Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD
Silverado HD/2500/3500 Crew Cab DRW** 4/27/2018 5/10/2019 TBD Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD
Low Cab Forward Model 3500HD 6/27/2019 9/27/2019 TBD TBD 1/2/2019 TBD
Low Cab Forward Models 3500/4500 9/27/2018 12/21/2018 TBD 10/9/2018 1/2/2019 TBD
VANS
City Express TBD TBD TBD TBD TBD TBD
Express Cargo (exclud. FGO & FBC order types)* 4/4/2019 8/3/2019 15-17 wks 5/9/2019 85/2019 15-17 wks
Express Cargo (incld. FGO & FBC order types)* 4/11/2019 8/16/2019 15-17 wks 6/20/2019 8/19/2019 15-17 wks
Express Cutaway (exclud. FGO & FBC order types)* 4/4/2019 8/3/2019 18-20 wks 5/9/2019 85/2019 18-20 wks
Express Cutaway (incld. FGO & FBC order types)* 4/11/2019 8/16/2019 18-20 wks 6/20/2019 8/19/2019 18-20 wks
Express Passenger (exclud. FGO & FBC order types)* 4/4/2019 8/3/2019 18-20 wks 5/9/2019 85/2019 18-20 wks
Express Passenger (incld. FGO & FBC order types)* 4/11/2019 8/16/2019 18-20 wks 6/20/2019 8/19/2019 18-20 wks
SUV's
Equinox* 3/21/2019 6/15/2019 13-15 wks 4/25/2019 6/17/2019 13-15 wks
Suburban 3/21/2019 6/22/2019 10-12 wks 5/9/2019 6/24/2019 10-12 wks
Tahoe 3/21/2019 6/22/2019 10-12 wks 5/9/2019 6/24/2019 10-12 wks
Tahoe Police 3/21/2019 6/22/2019 10-12 wks 5/9/2019 6/24/2019 10-12 wks
Traverse 1/10/2019 6/14/2019 21-23 wks 4/25/2019 6/17/2019 21-23 wks
Trax 3/21/2019 6/28/2019 14-16 wks 4/25/2019 7/1/2019 14-16 wks
*Requires Pre Approval
**Controlled Allocation
Model 2019 Final Fleet Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Chrysler

The following chart provides vehicle build-out and start-up dates for Chrysler. These updates change regularly and were last updated on March 29, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
300/300C 8/8/2019 11/15/2019 8-10 wks 9/10/2019 11/18/2019 8-10 wks
Fiat 500/500L 500: 10/3/2019 500L: TBD 500: 12/23/2019 500L: TBD 10-12 wks TBD TBD TBD
Fiat 500X 04/11/19 07/31/19 10-12 wks TBD 10/1/2019 10-12 wks
TRUCKS
Pacifica 4/11/2019 7/5/2019 8-10 wks 5/7/2019 7/22/2019 8-10 wks
Pacifica Hybrid 4/11/2019 7/5/2019 8-10 wks 5/7/2019 7/22/2019 8-10 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Dodge

The following chart provides vehicle build-out and start-up dates for Dodge. These updates change regularly and were last updated on March 29, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Challenger 08/08/2019 11/15/2019 8-10 wks 09/10/19 11/18/19 8-10 wks
Charger 08/08/2019 11/15/2019 8-10 wks 09/10/19 11/18/19 8-10 wks
Police Charger 08/08/2019 11/15/2019 12-14 wks 09/10/19 11/18/19 12-14 wks
VANS
Grand Caravan 09/05/2019 12/13/2019 8-10 wks 11/12/19 01/06/20 8-10 wks
SUVS & CROSSOVERS
Durango 04/11/2019 07/20/2019 10-12 wks 05/07/19 07/29/19 10-12 wks
Journey 10/03/2019 12/23/2019 10-12 wks TBD TBD 10-12 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Ford

The following chart provides vehicle build-out and start-up dates for Ford. These updates change regularly and were last updated on April 17, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Fiesta 03/29/2019 08/01/2019 18-20 wks TBD TBD TBD
Fusion 05/03/2019 08/02/2019 10-12 wks 05/13/19 08/05/19 10-12 wks
Fusion Hybrid 05/03/2019 08/02/2019 10-12 wks 05/13/19 08/05/19 10-12 wks
Taurus 11/02/2018 03/01/2019 18-20 wks TBD TBD TBD
Taurus PI Sedan 11/02/2018 03/01/2019 18-20 wks TBD TBD TBD
Taurus PI Sedan VSO 11/02/2018 03/01/2019 18-20 wks TBD TBD TBD
Fusion Police VSO 05/03/2019 08/02/2019 10-12 wks 05/13/19 08/05/19 10-12 wks
Mustang 05/03/2019 08/09/2019 14-16 wks 05/14/19 08/12/19 14-16 wks
TRUCKS
Ranger 08/02/2019 11/15/2019 14-16 wks 08/12/19 11/18/19 14-16 wks
F150 DTP 07/05/2019 10/06/2019 10-12 wks 07/17/19 10/07/19 10-12 wks
F150 KCAP 07/05/2019 11/24/2019 10-12 wks 07/17/19 11/25/19 10-12 wks
F59 Stripped Chassis 05/22/2019 12/13/2019 18-20 wks 09/16/19 12/16/19 18-20 wks
F150 KCAP VSO 06/07/2019 09/20/2019 10-12 wks 08/16/19 12/02/19 10-12 wks
F150 Diesel/Police DTP 07/05/2019 11/24/2019 10-12 wks 07/17/19 11/25/19 10-12 wks
F150 Diesel/Police KCAP 07/05/2019 11/24/2019 10-12 wks 07/17/19 11/25/19 10-12 wks
Super Duty F250-F350 (without VSO content) 08/02/2019 05/22/2019 14-16 wks 08/14/19 KTP: 11/4/2019 OHAP: 11/18/2019 14-16 wks
Super Duty F250-F350 VSO Paint 07/05/2019 10/07/2019 14-16 wks 08/14/19 12/02/19 14-16 wks
Super Duty F250-F350 VSO Equipment 07/05/2019 10/07/2019 14-16 wks 08/14/19 12/02/19 14-16 wks
Super Duty F450-F550 6.8L Gas Engine 07/05/2019 10/07/2019 14-16 wks 08/14/19 12/02/19 14-16 wks
Super Duty F450-F550 (without VSO content) 08/02/2019 05/22/2019 14-16 wks 08/14/19 KTP: 11/4/2019 OHAP: 11/18/2019 14-16 wks
Super Duty F450-F550 VSO Equipment 07/05/2019 10/07/2019 14-16 wks 08/14/19 12/02/19 14-16 wks
Super Duty Cab Chassis 07/05/2019 10/07/2019 14-16 wks 08/14/19 12/02/19 14-16 wks
Medium Truck F650-F750 08/30/2019 12/19/2019 14-16 wks 09/16/19 01/02/20 14-16 wks
Medium Truck F650-F750 6.8L Gas Engine 08/30/2019 12/19/2019 14-16 wks 09/16/19 01/02/20 14-16 wks
Medium Truck F650-F750 VSO 08/02/2019 08/22/2019 14-16 wks 09/16/19 11/14/19 14-16 wks
Motorhome 08/30/2019 12/13/2019 18-20 wks 09/16/19 12/16/19 18-20 wks
Motorhome VSO 08/30/2019 12/13/2019 18-20 wks 09/16/19 12/16/19 18-20 wks
VANS
Econoline Cutaway 05/22/2019 05/22/2019 TBD TBD TBD TBD
Econoline Cutaway 5.4L Engine 05/22/2019 05/22/2019 TBD TBD TBD TBD
Econoline Cutaway VSO 05/22/2019 05/22/2019 TBD TBD TBD TBD
Econoline 08/30/2019 12/19/2019 20-22 wks 09/16/19 01/02/20 20-22 wks
Econoline VSO 08/02/2019 08/22/2019 20-22 wks 09/16/19 11/14/19 20-22 wks
Transit Connect 02/01/2019 04/18/2019 20-22 wks 02/11/19 05/06/19 20-22 wks
TRANSIT VANS
Transit Van 07/05/2019 10/17/2019 07/15/19 10/21/19
Medium & High Roof, Long & Ext Wheelbase(E2C, E2D, F4U, F4X, R2C, R2D, R2U, R2X, R3U, R3X, S4U, S4X, W2C, W2D, W2U, W2X, W3U, W3X) 18-20 wks 18-20 wks
Transit Cutaway 07/05/2019 10/17/2019 07/15/19 10/21/19
Chassis Cab (F6P, F6Z, F8P, F8Z, F9P, F9Z, R5P, R5Z, R7P, R7Z, S6P, S6Z, S8P, S8Z, S9P, S9Z, W7P, W7Z) 18-20 wks 18-20 wks
Transit Wagon 07/05/2019 10/17/2019 07/15/19 10/21/19
Medium & High Roof, Long & Ext Wheelbase (K2C, K2X, U3X, X2C*, X2X*, U4X) 18-20 wks 18-20 wks
SUVS & CROSSOVERS
Ecosport 03/01/2019 06/28/2019 20-22 wks 04/01/19 07/01/19 20-22
Edge 07/05/2019 09/27/2019 14-16 wks 07/15/19 09/30/19 12--14
Escape 04/26/2019 08/02/2019 10-12 wks 05/13/19 08/19/19 10--12
Expedition 07/05/2019 10/13/2019 14-16 wks 07/17/19 10/14/19 12--14
Explorer 11/02/2018 03/01/2019 18-20 01/14/19 05/06/19 18-20
Explorer PI Utility 09/21/2018 03/01/2019 18-20 07/02/18 05/06/19 26-28
Explorer VSO PI Utility 09/21/2018 03/01/2019 18-20 07/02/18 06/03/19 26-28
Flex 08/30/2019 12/20/2019 14-16 wks TBD TBD TBD
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Genesis

The following chart provides vehicle build-out and start-up dates for Genesis. These updates change regularly and were last updated on January 16, 2019.

Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff
CARS
G70 03/01/2019 05/01/2019
G80 03/01/2019 05/01/2019
G80 Sport
G90 02/01/2019 04/01/2019
Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff

GMC Trucks

The following chart provides vehicle build-out and start-up dates for GMC Trucks. These updates change regularly and were last updated on April 8, 2019.

Model 2019 Fleet Final Order Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
TRUCKS
Canyon (w/ SEO) TBD 07/13/2019 9-11 wks 05/09/19 07/15/19 9-11 wks
Canyon Crew Cab 4/25/2019 07/15/2019 9-11 wks 05/09/19 07/15/19 9-11 wks
Sierra LD/1500 Reg Cab Next Gen 1/1/2019 08/03/2019 18-20 wks 05/09/19 08/05/19 18-20 wks
Sierra LD/1500 Reg Cab Next Gen (w/ SEO) TBD 08/03/2019 18-20 wks 05/09/19 08/05/19 18-20 wks
Sierra LD/1500 Extended Cab Next Gen 4/24/2019 08/02/2019 12-14 wks 05/09/19 08/05/19 12-14 wks
Sierra LD/1500 Crew Cab Next Gen 4/24/2019 08/03/2019 12-14 wks 05/09/19 08/05/19 12-14 wks
Sierra"limited" LD Double Cab Current Gen 7/4/2019 11/01/2019 12-14 wks TBD TBD TBD
Sierra HD/2500/3500 Reg Cab SRW 11/22/2018 04/25/2019 11-13 wks 07/18/19 09/01/19 11-13 wks
Sierra HD/2500/3500 Reg Cab DRW 11/22/2018 04/25/2019 11-13 wks 07/18/19 09/01/19 11-13 wks
Sierra HD/2500/3500 Double Cab 8/1/2019 12/13/2019 11-13 wks 7/18/2019 08/01/19 11-13 wks
Sierra HD/2500/3500 Crew Cab SRW 4/27/2018 05/10/2019 TBD Gas: 5/23/19 Diesel: 10/10/19 Gas: 8/1/2019 Diesel: 12/1/2019 TBD
Sierra HD/2500/3500 Crew Cab DRW 4/27/2018 05/10/2019 TBD Gas: 5/23/19 Diesel: 10/10/19 Gas: 8/1/2019 Diesel: 12/1/2019 TBD
VANS
Savana - Cargo (excld. FGO & FBC order types)* 5/2/2019 08/16/2019 11-13 wks 06/20/19 08/19/19 11-13 wks
Savana - Cargo (incld. FGO & FBC order types)* 4/11/2019 08/16/2019 11-13 wks 06/20/19 08/19/19 11-13 wks
Savana - Cutaway (excld. FGO & FBC order types)* 5/2/2019 08/16/2019 20-22 wks 06/20/19 08/19/19 20-22 wks
Savana - Cutaway (incld. FGO & FBC order types)* 4/11/2019 08/16/2019 20-22 wks 06/20/19 08/19/19 20-22 wks
Savana - Passenger (excld. FGO & FBC order types)* 4/11/2019 08/16/2019 22-24 wks 06/20/19 08/19/19 22-24 wks
Savana - Passenger (incld. FGO & FBC order types)* 5/2/2019 08/16/2019 22-24 wks 06/20/19 08/19/19 22-24 wks
SUVS & CROSSOVERS
Acadia (next generation) 05/02/19 07/26/2019 9-11 wks 06/06/19 08/05/19 9-11 wks
Terrain 03/21/19 06/14/2019 10-12 wks 04/25/19 06/17/19 10-12 wks
Yukon 03/21/19 06/22/2019 10-12 wks 05/09/19 06/24/19 10-12 wks
Yukon XL 03/21/19 06/22/2019 10-12 wks 05/09/19 06/24/19 10-12 wks
Model 2019 Fleet Final Order Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Hyundai

The following chart provides vehicle build-out and start-up dates for Hyundai. These updates change regularly and were last updated on February 15, 2019.

Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff
CARS
Sonata (Gas) 05/15/19 07/01/2019 09/01/2019 4 0
Elantra ADa - 4 door 01/15/19 03/01/2019 05/01/2019 4 0
Elantra AD - 4 door 01/15/19 01/01/2019 03/01/2019 6 0
Elantra GT 03/15/19 05/01/2019 07/01/2019 6 0
Accent 01/15/19 03/01/2019 05/01/2019 6 0
Veloster TBD 02/01/2019 04/01/2019 6 0
Veloster N TBD 05/22/2019 05/22/2019 0 0
SUV
Santa Fe - TM 02/15/19 04/01/2019 06/01/2019 5 0
Santa Fe - XL Discontinued 0
Tucson 03/15/19 05/01/2019 07/01/2019 5 0
Kona 02/15/19 04/01/2019 06/01/2019 5 0
Ioniq EV 06/15/19 08/01/2019 10/01/2019 0 0
Ioniq HEV 05/15/19 07/01/2019 09/01/2019 5 0
Ioniq PHEV 05/15/19 07/01/2019 09/01/2019 8 0
Nexo (Fuel Cell) 05/22/2019 05/22/2019 0 0
Palisade 05/01/2019 07/01/2019 0 0
Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff

Jeep

The following chart provides vehicle build-out and start-up dates for Jeep. These updates change regularly and were last updated on May 15, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
Cherokee 04/11/2019 07/06/2019 8-10 wks 05/20/19 07/22/19 8-10 wks
Compasss 05/13/2019 08/03/2019 10-12 wks 06/11/19 08/05/19 10-12 wks
Grand Cherokee 04/11/2019 07/20/2019 10-12 wks 05/20/19 07/29/19 10-12 wks
Renegade 05/09/2019 07/15/2019 10-14 wks 05/29/19 08/15/19 10-14 wks
Wrangler (2-Door) 04/17/2019 07/20/2019 6-10 wks 05/20/19 07/22/19 6-10 wks
Wrangler (4-Door) 04/17/2019 07/20/2019 6-10 wks 05/20/19 07/22/19 6-10 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Lincoln

The following chart provides vehicle build-out and start-up dates for Lincoln. These updates change regularly and were last updated on March 29, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Aviator N/A N/A N/A 01/22/19 05/06/19 TBD
Continental 05/31/19 09/13/19 14-16 wks 07/08/19 09/16/19 14-16 wks
MKZ Hybrid 5/3/2019 8/2/2019 16-18 wks 5/13/2019 8/5/2019 16-18 wks
MKZ 5/3/2019 8/2/2019 16-18 wks 5/13/2019 8/5/2019 16-18 wks
TRUCKS
MKC 05/03/19 08/02/19 14-16 wks 05/13/19 08/19/19 14-16 wks
MKT 08/30/19 12/20/19 16-18 wks TBD TBD TBD
MKX/Nautilus 07/05/19 09/27/19 12-14 wks 07/15/19 09/30/19 12-14 wks
Navigator 07/05/19 10/13/19 10-12 wks 07/17/19 10/14/19 10-12 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Nissan

The following chart provides vehicle build-out and start-up dates for Nissan. These updates change regularly and were last updated on March 29, 2019.

Model 2019 Fleet Final Order Due Date 2019 Deliveries End 2019 Lead Time in weeks 2020 Order Banks Open 2020 Deliveries End 2020 Lead Time
CARS
370Z Coupe 10/01/18 03/31/19 8-20 wks 02/15/19 04/30/19 8-20 wks
370Z Roadster 10/01/18 03/31/19 8-20 wks TBD TBD TBD
Altima Sedan 02/28/19 07/31/19 8-20 wks 03/01/19 07/31/19 8-20 wks
Maxima 04/01/19 08/31/19 8-20 wks 04/15/19 09/30/19 8-20 wks
Sentra 06/01/19 10/31/19 8-20 wks 06/15/19 11/30/19 8-20 wks
Versa Note (Hatchback) 01/01/19 05/31/19 8-20 wks TBD TBD TBD
Versa Sedan 03/01/19 06/30/19 8-20 wks 03/01/19 07/31/19 8-20 wks
TRUCKS
Frontier TBD TBD TBD TBD TBD TBD
Titan Diesel XD CC TBD TBD TBD TBD TBD TBD
Titan Gas CC (Incl XD) TBD TBD TBD TBD TBD TBD
Titan Gas/Dsl Sngl Cab (Incl XD) TBD TBD TBD TBD TBD TBD
VANS
NV 200 Cargo 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 8-20 wks
NV Cargo 1500/2500 (V6) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 8-20 wks
NV Cargo 2500/3500 (V8) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 8-20 wks
NV Passenger (V6) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 8-20 wks
NV Passenger (V8) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 8-20 wks
SUVS & CROSSOVERS
Armada 03/01/19 08/31/19 8-20 wks 03/15/19 07/31/19 8-20 wks
Kicks TBD TBD TBD TBD TBD TBD
Murano 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 8-20 wks
Pathfinder 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 8-20 wks
Rogue 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 8-20 wks
Rogue Sport 04/01/19 09/30/19 8-20 wks 04/15/19 10/31/19 8-20 wks
Model 2019 Fleet Final Order Due Date 2019 Deliveries End 2019 Lead Time in weeks 2020 Order Banks Open 2020 Deliveries End 2020 Lead Time

Ram

The following chart provides vehicle build-out and start-up dates for Ram. These updates change regularly and were last updated on May 15, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
VANS
Ram ProMaster City Van 04/08/2019 06/15/2019 Orders: 18-20 Pool Orders: 6-8 wks 04/24/19 07/01/19 Orders: 18-20 Pool Orders: 6-8 wks
Ram ProMaster Commercial Van 05/02/2019 09/27/2019 14-16 wks 06/11/19 09/30/19 14-16 wks
TRUCKS
Ram 1500 Quad/Crew Cab Pickup 09/05/2019 12/21/2019 8-10 wks 10/08/19 12/16/19 8-10 wks
Ram 1500 Regular Cab Pickup (old style) 09/05/2019 12/21/2019 12-14 wks TBD TBD 12-14 wks
Ram 1500 Regular Cab Pickup (new style) 04/11/2019 07/20/2019 12-14 wks 05/07/19 07/22/19 12-14 wks
Ram 2500 Pickup 06/27/2019 10/05/2019 TBD 08/07/19 10/07/19 TBD
Ram 3500 Pickup 06/27/2019 10/05/2019 TBD 08/07/19 10/07/19 TBD
Ram Cab Chassis 3500 06/27/2019 10/05/2019 TBD 08/07/19 10/07/19 TBD
Ram Cab Chassis 4500/5500 - Gas Engine 04/11/2019 10/05/2019 TBD 08/07/19 10/07/19 TBD
Ram Cab Chassis 4500/5500 - Diesel Engine 04/11/2019 10/05/2019 TBD 08/07/19 10/07/19 TBD
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Subaru

The following chart provides vehicle build-out and start-up dates for Subaru. These updates change regularly and were last updated on May 17, 2019.

Model 2019 Fleet Final Order Due Date* 2019 Order Receipt cutoff * 2019 Lead Time in weeks ** 2020 Order Banks Open 2020 First Delivery Month 2020 Lead Time
Cars
Legacy Completed 5/20/2019 10-12 wks 7/15/2019 11/01/2019 10-12 wks
Impreza 6/30/2019 8/20/2019 10-12 wks 10/1/2019 11/01/2019 10-12 wks
WRX/Sti 5/31/2019 7/20/2019 10-12 wks 8/15/2019 10/01/2019 10-12 wks
BRZ 5/31/2019 7/20/2019 10-12 wks 8/15/2019 10/01/2019 10-12 wks
SUVS & CROSSOVERS
Ascent Completed Completed 10-12 wks 5/15/2019 07/01/2019 10-12 wks
Forester 5/31/2019 7/20/2019 10-12 wks 8/31/2019 10/01/2019 10-12 wks
Outback Completed 6/20/2019 10-12 wks 7/15/2019 11/01/2019 10-12 wks
Crosstrek 7/31/2019 9/20/2019 10-12 wks 10/1/2019 11/01/2019 10-12 wks
* Orders received between final order due date and cutoff are on a "Will Try" basis. Some colors and options may not be available
** these lead times are subject to change if there is an upfit/through code on the order
Model 2019 Fleet Final Order Due Date* 2019 Order Receipt cutoff * 2019 Lead Time in weeks ** 2020 Order Banks Open 2020 First Delivery Month 2020 Lead Time

Toyota

The following chart provides vehicle build-out and start-up dates for Toyota. These updates change regularly and were last updated on May 15, 2019.

Model 2019 Fleet Final Order Due date 2019 Final Order Due Date 2019 Lead Time 2020 Order Banks Open 2020 Production Startup*** 2020 Lead Time
Cars
86 12-20 wk
Avalon (Gas) 04/10/2019 06/30/2019 12-20 wk 05/10/2019 07/31/2019 12-20 wk
Avalon HV (Hybrid) 04/10/2019 06/30/2019 12-20 wk 05/10/2019 07/31/2019 12-20 wk
C-HR 07/10/2019
Camry 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Camry Hybrid 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Corolla 11/01/2018 12/31/2018 12-20 wk 12/14/2018 03/31/2019 12-20 wk
Corolla Hatchback 06/10/2019 08/31/2019 12-20 wk 05/01/2019 01/09/1900 12-20 wk
Prius 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Prius C 04/10/2019 06/30/2019 12-20 wk 05/01/2019 05/22/2019 12-20 wk
Prius Prime 02/11/2019 04/30/2019 12-20 wk 03/11/2019 05/31/2019 12-20 wk
Prius V 05/22/2019 05/22/2019 12-20 wk 05/22/2019 05/22/2019 TBD
TRUCKS
Tacoma 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Tundra 04/10/2019 06/30/2019 12-20 wk 05/10/2019 07/31/2019 12-20 wk
VAN
Sienna 12/10/2018 02/28/2019 12-20 wk 01/10/2019 03/31/2019 12-20 wk
SUVS & CROSSOVERS
4Runner 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Highlander 08/12/2019 10/31/2019 12-20 wk 09/10/2019 11/30/2019 12-20 wk
Highlander Hybrid 08/12/2019 10/31/2019 12-20 wk 11/10/2019 01/31/2020 12-20 wk
Land Cruiser 05/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Mirai (Fuel Cell)* 08/12/2019 10/31/2019 12-20 wk 09/10/2019 11/30/2019 12-20 wk
Rav4 06/10/2019 08/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
Rav4 Hybrid 06/10/2019 07/31/2019 12-20 wk 06/10/2019 08/31/2019 12-20 wk
*Only available in California from select dealers
Model 2019 Fleet Final Order Due date 2019 Final Order Due Date 2019 Lead Time 2020 Order Banks Open 2020 Production Startup*** 2020 Lead Time

Volkswagen

The following chart provides vehicle build-out and start-up dates for Volkswagen. These updates change regularly and were last updated on March 29, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in days* 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
Cars
Golf TBD 08/02/2019 90-100 days TBD 8/5/2019 90-100 days
Golf R TBD 06/28/2019 90-100 days N/A N/A 90-100 days
Golf SportWagen TBD 08/02/2019 90-100 days N/A TBD 90-100 days
Golf Alltrack TBD 08/02/2019 90-100 days N/A TBD 90-100 days
GTI TBD 08/02/2019 90-100 days TBD 8/5/2019 90-100 days
Bettle Coupe Closed 07/19/2019 90-100 days N/A N/A N/A
Bettle Convertible Closed 07/19/2019 90-100 days N/A N/A N/A
Jetta TBD 08/02/2019 90-100 days N/A 8/5/2019 90-100 days
Passat 10/10/2018 01/04/2019 90-100 days TBD TBD 90-100 days
SUVS & CROSSOVERS
Atlas TBD 08/02/2019 90-100 days TBD 8/5/2019 90-100 days
Tiguan TBD 08/02/2019 90-100 days TBD 8/12/2019 90-100 days
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in days* 2020 Order Banks Open 2020 Production Startup 2020 Lead Time